Methodologies
Methodology templates, lifecycles, gates and smart checklists.
- Methodology templates
- 5
- Projects on the templates
- 36
- Gates defined
- 14
- Checklist items
- 33
For every project type and size
Every project of the entity
Across every template
29 of them mandatory
Project types
A configurable list: add a type, rename or retire it, and set the methodology every new project of that type starts on.
Active types
7Retired types
1Projects classified
36- Construction4 projectsNew premises, branches and qualification centres: design, build, supervision and handover.
- Infrastructure & facilities13 projectsRehabilitating existing buildings, energy, networks and test halls.
- Digital platforms & services7 projectsMuqawil and its app, Wifaq, Irtiqaa and the electronic model contracts.
- Information technology7 projectsEnterprise systems, cloud, cybersecurity and data centres.
- Consulting & studies2 projectsStrategy, performance measurement, governance and sector studies.
- Services & events2 projectsThe Future Projects Forum, conferences, exhibitions and the excellence award.
- Organisational transformation1 projectOperating model, accountability and capability inside the Authority.
- Research & pilotsRetiredPilots and proofs of concept before scaling up.