Hussam T. Al-QurashiLeave on critical workHussam’s leave falls in the last two weeks of the “Government Service Bus integration” package, on the critical pathRecommendation
Eng. Waleed O. Al-JuhaniLeave on critical workWaleed is away during the commissioning tests of the new Dammam wing, with no named deputy
Reallocation recommendations
Copilot proposes them from skills, loads and the critical path — apply one to see the effect at once
Reassigning Eng. Saad Al-Dosari cuts Muqawil’s delay by 12 days
Raise Saad’s Muqawil allocation from 15% to 50% for 10 weeks and move the integration with the authority’s internal systems to him from Hussam Al-Qurashi — Hussam returns to 100% and the “Government Service Bus integration” on the critical path speeds up.
Rakan Al-Mohammadi starts the Project Tracking Platform’s data preparation
Rakan is at 70% with data engineering (4/5). Giving 25% of him to the Project Tracking Platform from December covers half an open seat and pulls the registered-project data preparation forward by nine days.
Deferring the unified operations-centre study a month eases the January peak
Eng. Omar Bawazir runs three live projects and reaches 107% in January if the proposed study starts alongside them. Moving its start to February brings him to 84% that month with no effect on his running projects.