Saudi Contractors AuthorityMunjaz11My actionsNotifications

Priority evaluation

An electronic form with an auto-filled header, an approval path and its versions, printed with its approval log.

Saudi Contractors AuthorityMunjazStrategy & projectsMunjazPMO PLATFORM

Proposal

Priority evaluation

Criteria, weights and the P1–P4 result

Form no.
SCA-PMO-F02
Template edition
1.3
Version
V4
Form date
⁦2026-05-15⁩
Hijri
28 Dhuʻl-Qiʻdah 1447 AH
ApprovedDMD-2026-005Redesigning contractor waiting areas in the existing branches

Auto-filled — Filled by the platform from the project record, not typed.

Proposal no.
DMD-2026-005
Proposal
Redesigning contractor waiting areas in the existing branches
Portfolio
Headquarters & Regional Centres Portfolio
Sector
Qualification & Training Sector
Sponsor
Eng. Abdulrahman S. Al-Harbi
Proposed by
Eng. Fahad T. Al-Sulami

1The resultAuto-filled

Priority score

63 of 100

Class

P2

60–74

Priority model

Version 4

Class thresholdsAuto-filled

P1 from 75 · P2 from 60 · P3 from 45 · P4 below 45

2Criteria and weightsAuto-filled

Rated 1–5; the cost criteria (risk, complexity, resources) are turned around before weighting.

CriterionWeightRatingPoints
Fit with the SCA strategy⁦20%⁩4.316.5
Value added to the contracting sector⁦12%⁩4.19.3
Financial return & sustainability⁦8%⁩3.04.0
Urgency⁦10%⁩3.35.7
Regulatory requirement⁦10%⁩1.41.0
Risk⁦7%⁩2.44.5
Complexity⁦6%⁩2.83.3
Resource requirement⁦5%⁩2.33.4
Impact on contractors & beneficiaries⁦14%⁩4.311.6
Sustainability impact⁦3%⁩3.72.0
Digital transformation impact⁦5%⁩2.01.3
Total⁦100%⁩—63

Approval logChain: Priority evaluation approval · version ⁦1⁩

Every decision on the form — who, their role, the note and the time. It prints with the form.

#StepKindNameDecisionNoteDate & time
1Author—Ghada A. Al-ShahraniDirector, Qualification Programmes & CapabilitySubmitted—⁦2026-05-15⁩ 11:32
2Evaluation checked against the modelMethodology reviewGhada A. Al-ShahraniPMO — analystApproved—⁦2026-05-17⁩ 13:40
3Portfolio manager reviewTechnical acceptanceEng. Bandar M. Al-ShammariPortfolio managerApproved—⁦2026-05-19⁩ 14:47
4Class approved — Project Approval CommitteeTechnical acceptanceDr. Noura M. Al-OtaibiProject Approval CommitteeApproved—⁦2026-05-24⁩ 09:54

Signatures

Evaluation checked against the model

Ghada A. Al-Shahrani

Approved⁦2026-05-17⁩

Portfolio manager review

Eng. Bandar M. Al-Shammari

Approved⁦2026-05-19⁩

Class approved — Project Approval Committee

Dr. Noura M. Al-Otaibi

Approved⁦2026-05-24⁩

Issued from Munjaz — Saudi Contractors Authority · ⁦2026-10-28⁩Form SCA-PMO-F02 · version V4

Priority evaluation

Prints the form and its approval log on A4.

Approval path

Read from the approval engine: the steps, their holders and the time limits in working days.

Chain: Priority evaluation approval · version ⁦1⁩

Submitted by Ghada A. Al-Shahrani on ⁦2026-05-15⁩

  1. Methodology review

    Evaluation checked against the model

    Ghada A. Al-Shahrani · PMO — analyst

    Approved · ⁦2026-05-17⁩ at ⁦13:40⁩

  2. Technical acceptance

    Portfolio manager review

    Eng. Bandar M. Al-Shammari · Portfolio manager

    Approved · ⁦2026-05-19⁩ at ⁦14:47⁩

  3. Technical acceptance

    Class approved — Project Approval Committee

    Dr. Noura M. Al-Otaibi · Project Approval Committee

    Approved · ⁦2026-05-24⁩ at ⁦09:54⁩

Approval complete — the form is approved and in force.

Previous versions

Every version is kept with its status and what changed.

  1. V4ApprovedCurrent⁦2026-05-15⁩

    Evaluated on the approved priority model

    Ghada A. Al-Shahrani

Only one version so far.

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close