Jeddah branch & centre geotechnical survey report

Jeddah Branch & Qualification Centre

⁦1⁩. Executive summary

This report gives the position of Jeddah Branch & Qualification Centre to date: ⁦39%⁩ complete against ⁦50%⁩ planned, SPI ⁦0.78⁩, CPI ⁦0.89⁩, and an estimate at completion of SAR ⁦321.3M⁩.

Project
Jeddah Branch & Qualification Centre (⁦PRJ-2026-006⁩)
Project manager
Eng. Fahad T. Al-Sulami
Budget
SAR ⁦286.0M⁩
Progress
⁦39%⁩ actual against ⁦50%⁩ planned
Forecast finish
⁦2027-07-04⁩

⁦2⁩. Key findings

  • All planned milestones of the period met except one deferred
  • Actual spend rose in line with the work done
  • Three high risks under treatment, each with a named owner

⁦3⁩. Recommendations & decisions needed

  • Approve the proposed treatment of the high risks
  • Track the open findings with the vendor weekly

Prepared by

Eng. Fahad T. Al-Sulami
Issued from Munjaz — valid only once approved electronically1 / 1