Preliminary handover certificate — Khamis Mushait training centre
Khamis Mushait Training Centre Rehabilitation
Preliminary handover certificate — Khamis Mushait training centre
- Project
- Khamis Mushait Training Centre Rehabilitation (PRJ-2026-036)
- Project manager
- Eng. Waleed O. Al-Juhani
- Budget
- SAR 67.0M
- Progress
- 97% actual against 99% planned
- Forecast finish
- 2026-11-12
The handover committee certifies that the works listed were carried out to the contract and specification, with the attached snag list to be closed during the defects period.
Prepared by
Eng. Waleed O. Al-Juhani