RSK-0041Solar Power for SCA Buildings & Centres

Falling global panel prices allow more capacity within budget

12OpportunityOpenOpportunity

A risk's detail, response, contingency and residual risk.

Risk statement

From enabler to opportunity to benefit — with the actions that seize it and the fallback

Enabler

Global solar panel prices down 18% this year

Actions to seize it

  • Renegotiate the second panel batch
  • Add three training centres to the installation scope

2 / 2

Opportunity

More installed capacity on SCA buildings and centres within the same budget

12OpportunityTrigger

A quote under SAR 2.1 per watt

Fallback

If prices rise again, keep to the original scope

Benefit

2.4 MW more and about SAR 5.2M a year more in power savings

SAR 5.2M

Assessment

The level before and after the response

Inherent

5
4
3
2
1
1
2
3
4
5
12Opportunity

Residual

5
4
3
2
1
1
2
3
4
5
12Opportunity

Potential value

SAR 5.2M

Residual

No reduction expected — the response is to accept

Score trend

Last six months

  • Score
  • Target residual

Escalation path

Escalation engine: a high risk unreviewed for 10 days notifies the PM, 15 the programme manager, 20 the PMO director

Last reviewed 3 days ago · Outside the engine — below «high»

  1. Project manager

    Current level

    Eng. Mishari K. Al-Otaibi

    Currently followed up here
  2. 2

    Programme manager

    Eng. Mishari K. Al-Otaibi

  3. 3

    PMO director

    Dr. Noura M. Al-Otaibi

  4. 4

    Executive committee

    Dr. Abdullah S. Al-Qahtani

    By the PMO director’s decision

Mitigation plan

Actions to seize the opportunity, with owners and dates

⁦0⁩ of ⁦2⁩ done
  • Renegotiate the second panel batch

    Eng. Mishari K. Al-OtaibiEng. Mishari K. Al-OtaibiDirector, Sustainability & Energy EfficiencyP-028m.alotaibi@sca.sa
    In progressIn 33 days2026-11-3020 Jumada II 1448 AH
  • Add three training centres to the installation scope

    Eng. Mishari K. Al-OtaibiEng. Mishari K. Al-OtaibiDirector, Sustainability & Energy EfficiencyP-028m.alotaibi@sca.sa
    Not startedIn 53 days2026-12-2011 Rajab 1448 AH

Trigger

A quote under SAR 2.1 per watt

Fallback

If prices rise again, keep to the original scope

Opportunity strategy

§26 — choose how you will seize it

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close