Saudi Contractors AuthorityMunjaz11My actionsNotifications

Saudi Contractors Authority Strategy — Building the Future with Confidence

Sector master data documented in the data catalogue

Off trackSystem reading, owner to confirm

Transparency and open sector information·A Cornerstone of Sector Development

Actual · October

41%

2026 target

⁦60%⁩

Attainment

⁦68%⁩

Year-end forecast

⁦47%⁩

Forecast gap to target

⁦13%⁩

The path from baseline to 2030

Where the KPI stands today between its baseline, this year’s target and the 2030 target.

Baseline

⁦15%⁩

Today

⁦41%⁩

2026 target

⁦60%⁩

2030 target

⁦100%⁩

Left to the 2026 target
⁦19%⁩⁦58%⁩ of the way covered
Left to the 2030 target
⁦59%⁩⁦31%⁩ of the way covered

Monthly series and forecast

January – October measured, November and December forecast with a confidence band; the gold line is the 2026 target.

Monthly series and forecast
  • Actual
  • Baseline
  • Forecast
  • Forecast range
Monthly series and forecast
PeriodActualBaseline
Jan16 %15 %
Feb18 %15 %
Mar20 %15 %
Apr23 %15 %
May26 %15 %
Jun29 %15 %
Jul32 %15 %
Aug35 %15 %
Sep38 %15 %
Oct41 %15 %
Nov (Forecast)44 %15 %
Dec (Forecast)47 %15 %

Measurement history

Every reading with who entered it, its evidence and its approval. Formal measurement points are marked.

PeriodValueOf targetKindStateEntered byEvidence
October 202641⁦68%⁩Formal measurementAwaiting ownerSystem (automatic reading)2026-10-26None
September 202638⁦63%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-10-05K-2.3.1_2026-09.pdf
August 202635⁦58%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-09-04K-2.3.1_2026-08.pdf
July 202632⁦53%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-08-07K-2.3.1_2026-07.pdf
June 202629⁦48%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-07-06K-2.3.1_2026-06.pdf
May 202626⁦43%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-06-05K-2.3.1_2026-05.pdf
April 202623⁦38%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-05-04K-2.3.1_2026-04.pdf
March 202620⁦33%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-04-07K-2.3.1_2026-03.pdf
February 202618⁦30%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-03-06K-2.3.1_2026-02.pdf
January 202616⁦27%⁩Formal measurementApprovedRahaf I. Al-Nefaie2026-02-05K-2.3.1_2026-01.pdf

Contributing projects

The projects that move this KPI, and each one’s share of the effect by budget size.

AI insight

Closing the gap runs through one project

The project with the most weight on this KPI is “Contracting Sector Information Centre & Data Governance”, with ⁦100%⁩ of the linked budget, and it is At risk. Speeding it up is the fastest way to close the gap before December.

Confidence⁦78%⁩

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • Contract two data engineers to cover the vacant posts

    Rahaf I. Al-NefaieRahaf I. Al-NefaieDirector, Data & InnovationP-027r.alnefaie@sca.saDue ⁦2026-11-10⁩In 13 days2026-11-1030 Jumada I 1448 AHContracting Sector Information Centre & Data Governance
    In progress
  • Make data owners in the sectors and branches document their entities as part of their objectives

    Eng. Majed S. Al-RasheedEng. Majed S. Al-RasheedHead, Digital Transformation SectorP-011m.alrasheed@sca.saDue ⁦2026-12-31⁩In 64 days2026-12-3122 Rajab 1448 AH
    Open

Comments

The owner, the Performance Measurement Office and leadership discussing the readings.

  1. Rahaf I. Al-NefaieDirector, Data & Innovation2026-10-24 10:00

    The reading is automatic from the national catalogue. I am waiting for the data owners in the information centre before confirming.

0 / 600

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close