Internal
Kingdom of Saudi Arabia
Saudi Contractors Authority
Project Management Office (PMO)
- Code
- DOC-0211
- Version
- V7
- Date
- 2026-10-07
Construction drawings — conference & exhibition building
SCA Headquarters, Riyadh
1. Description
Construction drawings — conference & exhibition building — issued for review and coordination with the parties concerned.
- Project
- SCA Headquarters, Riyadh (PRJ-2026-002)
- Project manager
- Eng. Ahmed Y. Asiri
- Budget
- SAR 1180.0M
- Progress
- 42% actual against 51% planned
- Forecast finish
- 2027-09-12
2. Revision log
| Rev. | Description | By |
|---|---|---|
| V7 | Issued for review | Eng. Ibrahim A. Al-Ghamdi |
| V6 | Levels revised | Eng. Adel S. Al-Amoudi |
| V5 | Issued for construction | Eng. Adel S. Al-Amoudi |
| V4 | Utility diversions updated | Eng. Adel S. Al-Amoudi |
Note: this issue is valid once signed by the supervising consultant and the project manager.
Prepared by
Eng. Ibrahim A. Al-Ghamdi
Project manager
Eng. Ahmed Y. Asiri
Internal