Proposal

Project proposal & feasibility study

Justification, objectives, benefits, cost and initial risks

Form no.
SCA-PMO-F01
Template edition
2.1
Version
V2
Form date
⁦2026-04-15⁩
Hijri
27 Shawwal 1447 AH
ApprovedDMD-2026-005Redesigning contractor waiting areas in the existing branches

Auto-filled — Filled by the platform from the project record, not typed.

Proposal no.
DMD-2026-005
Proposal
Redesigning contractor waiting areas in the existing branches
Portfolio
Headquarters & Regional Centres Portfolio
Sector
Qualification & Training Sector
Sponsor
Eng. Abdulrahman S. Al-Harbi
Proposed by
Eng. Fahad T. Al-Sulami

1The proposalAuto-filled

TitleAuto-filled
Redesigning contractor waiting areas in the existing branches
Proposed byAuto-filled
Eng. Fahad T. Al-Sulami
DepartmentAuto-filled
Regional Qualification Centres Department
Submitted onAuto-filled
⁦2026-04-15⁩
Proposal numberAuto-filled
DMD-2026-005

2Justification

The problem or need

Branch managers in Riyadh, Jeddah and Al-Khobar report crowded reception areas on skills-test days — contractors and trainees wait in the corridors outside the halls — and 140 formal complaints were logged in 2025.

Today

Reception areas in the existing branches hold only 40% of peak attendance, with no calling screens or service desks near the halls.

3Objectives

  1. Redesign contractor waiting areas in 14 existing branches and centres with proper halls and calling screens tied to the test and appointment schedules by 2029.

Strategic objectives served

  • SO-3.3 — A better contractor experience and service quality

4Expected benefits

KindBenefit
SatisfactionContractor satisfaction with branch service up 6 points
Time savedWaiting time before an appointment or test down 40%
ProductivityTests start on time with electronic calling

5Cost & feasibilityAuto-filled

Estimated cost

SAR 38M

Net present value

SAR 5.2M

Return on investment

⁦37%⁩

Payback

5.5 years

YearCapexOpexBenefit
2027SAR 14MSAR 0SAR 0
2028SAR 18MSAR 400KSAR 0
2029SAR 6MSAR 1.2MSAR 5.2M
2030SAR 0SAR 1.3MSAR 9.6M
2031SAR 0SAR 1.3MSAR 11.2M
2032SAR 0SAR 1.4MSAR 12.1M
2033SAR 0SAR 1.4MSAR 12.6M
2034SAR 0SAR 1.5MSAR 13M

6Initial risks

RiskLevelProposed response
Works clashing with test and service daysHighPhase the works branch by branch and outside service hours
Funding not approved in the 2027 budgetHighSplit delivery across two fiscal years

Approval logChain: Proposal & feasibility approval · version ⁦4⁩

Every decision on the form — who, their role, the note and the time. It prints with the form.

#StepKindNameDecisionNoteDate & time
1Author—Eng. Fahad T. Al-SulamiDirector, Regional Qualification CentresSubmitted—⁦2026-04-15⁩ 10:07
2Line manager endorsementTechnical acceptanceEng. Reem K. Al-DosariThe requester’s line managerApproved—⁦2026-04-19⁩ 12:21
3PMO reviewMethodology reviewGhada A. Al-ShahraniPMO — analystApproved—⁦2026-04-21⁩ 13:28
4Portfolio manager reviewTechnical acceptanceEng. Bandar M. Al-ShammariPortfolio managerApproved—⁦2026-04-26⁩ 14:35
5Cost & funding reviewFinancial approvalMunirah A. Al-KhalidiFinanceApproved—⁦2026-04-28⁩ 12:51
6Project Approval CommitteeTechnical acceptanceDr. Noura M. Al-OtaibiProject Approval CommitteeApproved—⁦2026-05-03⁩ 10:49

Signatures

Line manager endorsement

Eng. Reem K. Al-Dosari

Approved⁦2026-04-19⁩

PMO review

Ghada A. Al-Shahrani

Approved⁦2026-04-21⁩

Portfolio manager review

Eng. Bandar M. Al-Shammari

Approved⁦2026-04-26⁩

Cost & funding review

Munirah A. Al-Khalidi

Approved⁦2026-04-28⁩

Project Approval Committee

Dr. Noura M. Al-Otaibi

Approved⁦2026-05-03⁩

Issued from Munjaz — Saudi Contractors Authority · ⁦2026-10-28⁩Form SCA-PMO-F01 · version V2

Project proposal & feasibility study

Prints the form and its approval log on A4.

Approval path

Read from the approval engine: the steps, their holders and the time limits in working days.

Chain: Proposal & feasibility approval · version ⁦4⁩

Submitted by Eng. Fahad T. Al-Sulami on ⁦2026-04-15⁩

  1. Technical acceptance

    Line manager endorsement

    Eng. Reem K. Al-Dosari · The requester’s line manager

    Approved · ⁦2026-04-19⁩ at ⁦12:21⁩

  2. Methodology review

    PMO review

    Ghada A. Al-Shahrani · PMO — analyst

    Approved · ⁦2026-04-21⁩ at ⁦13:28⁩

  3. Technical acceptance

    Portfolio manager review

    Eng. Bandar M. Al-Shammari · Portfolio manager

    Approved · ⁦2026-04-26⁩ at ⁦14:35⁩

  4. Financial approval

    Cost & funding review

    Munirah A. Al-Khalidi · Finance

    On the path because: Financial link?

    Approved · ⁦2026-04-28⁩ at ⁦12:51⁩

  5. Technical acceptance

    Project Approval Committee

    Dr. Noura M. Al-Otaibi · Project Approval Committee

    Approved · ⁦2026-05-03⁩ at ⁦10:49⁩

Approval complete — the form is approved and in force.

Previous versions

Every version is kept with its status and what changed.

  1. V1Approved⁦2026-04-15⁩

    First version of the proposal

    • Filled from the proposal wizard

    Eng. Fahad T. Al-Sulami

Only one version so far.