Eng. Firas Abdulkarim
Planning & Scheduling Engineer — Bait Al-Khebra · Construction Projects Department
Eng. Firas Abdulkarim
Planning & Scheduling Engineer — Bait Al-Khebra
- Mobile
- +966 58 117 6620
Engineering & construction delivery
Load now
Full
Free a week
0 h
40 h/week
This month’s cost
SAR 45K
At today’s allocation
Next peak
100%
In November 2026
- Planned as
- Field engineer
- Department
- Construction Projects Department
- Hourly cost
- 260
- 40 h/week
- Work location
- SCA HQ project site — Riyadh
- Joined
- 2024-03-03
Allocation across projects
July 2026 to June 2027 — planned bars are faded, leave is shaded
Monthly utilisation
Share of monthly capacity; the gold line is 100%
- Projects
- Outside projects
- Capacity
| Category | Projects | Outside projects | Total | Capacity |
|---|---|---|---|---|
| Jul | 100% | 0% | 100% | 100% |
| Aug | 100% | 0% | 100% | 100% |
| Sep | 100% | 0% | 100% | 100% |
| Oct | 100% | 0% | 100% | 100% |
| Nov | 100% | 0% | 100% | 100% |
| Dec | 100% | 0% | 100% | 100% |
| Jan | 100% | 0% | 100% | 100% |
| Feb | 100% | 0% | 100% | 100% |
| Mar | 100% | 0% | 100% | 100% |
| Apr | 100% | 0% | 100% | 100% |
| May | 100% | 0% | 100% | 100% |
| Jun | 100% | 0% | 100% | 100% |
Calendar & availability
Working days are Sunday to Thursday
Working days: 21 · days off: 0 · load 100%
Recorded leave
No leave recorded in this period
Skills & certifications
Levels 1 to 5, rated by the line manager
- Civil engineering4/5
- Project management3/5
- Risk management3/5
Professional certifications
- PMI-SPProject Management Institute (PMI) · Issued 2021-08-22 · Expires 2027-08-21Valid
Timesheet summary
The last eight weeks — billable and non-billable
Average week
40 h
40 h/week
Billable share
99%
Sent on time
7 of 7
- Billable
- Non-billable
| Category | Billable | Non-billable | Total |
|---|---|---|---|
| Week 37 | 40 h | 0 h | 40 h |
| Week 38 | 40 h | 2 h | 42 h |
| Week 39 | 39 h | 0 h | 39 h |
| Week 40 | 40 h | 1 h | 41 h |
| Week 41 | 38 h | 0 h | 38 h |
| Week 42 | 40 h | 1 h | 41 h |
| Week 43 | 40 h | 0 h | 40 h |
| Week 44 | 24 h | 0 h | 24 h |