Saudi Contractors AuthorityMunjaz11My actionsNotifications

Saudi Contractors Authority Strategy — Building the Future with Confidence

Contractors within 150 km of a branch or qualification centre

On trackApproved

SCA services and programmes in every region·Specialised, Value-adding Services

Actual · October

76.4%

2026 target

⁦78%⁩

Attainment

⁦98%⁩

Year-end forecast

⁦77.6%⁩

Forecast gap to target

⁦0.4%⁩

The path from baseline to 2030

Where the KPI stands today between its baseline, this year’s target and the 2030 target.

Baseline

⁦71%⁩

Today

⁦76.4%⁩

2026 target

⁦78%⁩

2030 target

⁦90%⁩

Left to the 2026 target
⁦1.6%⁩⁦77%⁩ of the way covered
Left to the 2030 target
⁦13.6%⁩⁦28%⁩ of the way covered

Monthly series and forecast

January – October measured, November and December forecast with a confidence band; the gold line is the 2026 target.

Monthly series and forecast
  • Actual
  • Baseline
  • Forecast
  • Forecast range
Monthly series and forecast
PeriodActualBaseline
Jan71.5 %71 %
Feb72 %71 %
Mar72.4 %71 %
Apr73 %71 %
May73.6 %71 %
Jun74.1 %71 %
Jul74.8 %71 %
Aug75.3 %71 %
Sep75.9 %71 %
Oct76.4 %71 %
Nov (Forecast)77 %71 %
Dec (Forecast)77.6 %71 %

Measurement history

Every reading with who entered it, its evidence and its approval. Formal measurement points are marked.

PeriodValueOf targetKindStateEntered byEvidence
October 202676.4⁦98%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-10-27K-3.1.3_2026-10_tracking.pdf
September 202675.9⁦97%⁩Formal measurementApprovedEng. Sami A. Al-Fraih2026-10-05K-3.1.3_2026-09.pdf
August 202675.3⁦97%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-09-04K-3.1.3_2026-08_tracking.pdf
July 202674.8⁦96%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-08-07K-3.1.3_2026-07_tracking.pdf
June 202674.1⁦95%⁩Formal measurementApprovedEng. Sami A. Al-Fraih2026-07-06K-3.1.3_2026-06.pdf
May 202673.6⁦94%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-06-05K-3.1.3_2026-05_tracking.pdf
April 202673⁦94%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-05-04K-3.1.3_2026-04_tracking.pdf
March 202672.4⁦93%⁩Formal measurementApprovedEng. Sami A. Al-Fraih2026-04-07K-3.1.3_2026-03.pdf
February 202672⁦92%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-03-06K-3.1.3_2026-02_tracking.pdf
January 202671.5⁦92%⁩Tracking readingApprovedEng. Sami A. Al-Fraih2026-02-05K-3.1.3_2026-01_tracking.pdf

Contributing projects

The projects that move this KPI, and each one’s share of the effect by budget size.

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

No corrective actions logged

The KPI is on track. Add an action when a deviation appears.

Comments

The owner, the Performance Measurement Office and leadership discussing the readings.

No comments yet. Start the discussion on this KPI.

0 / 600

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close