Saudi Contractors AuthorityMunjaz11My actionsNotifications

Saudi Contractors Authority Strategy — Building the Future with Confidence

Skills tests held per month

At riskApproved

A better contractor experience and service quality·Specialised, Value-adding Services

Actual · October

4.1thousand tests

2026 target

⁦4.5 thousand tests⁩

Attainment

⁦91%⁩

Year-end forecast

⁦4.3 thousand tests⁩

Forecast gap to target

⁦0.2 thousand tests⁩

The path from baseline to 2030

Where the KPI stands today between its baseline, this year’s target and the 2030 target.

Baseline

⁦3.2 thousand tests⁩

Today

⁦4.1 thousand tests⁩

2026 target

⁦4.5 thousand tests⁩

2030 target

⁦9 thousand tests⁩

Left to the 2026 target
⁦0.4 thousand tests⁩⁦69%⁩ of the way covered
Left to the 2030 target
⁦4.9 thousand tests⁩⁦16%⁩ of the way covered

Monthly series and forecast

January – October measured, November and December forecast with a confidence band; the gold line is the 2026 target.

Monthly series and forecast
  • Actual
  • Baseline
  • Forecast
  • Forecast range
Monthly series and forecast
PeriodActualBaseline
Jan3.3 thousand tests3.2 thousand tests
Feb3.3 thousand tests3.2 thousand tests
Mar3.4 thousand tests3.2 thousand tests
Apr3.5 thousand tests3.2 thousand tests
May3.6 thousand tests3.2 thousand tests
Jun3.7 thousand tests3.2 thousand tests
Jul3.8 thousand tests3.2 thousand tests
Aug3.9 thousand tests3.2 thousand tests
Sep4 thousand tests3.2 thousand tests
Oct4.1 thousand tests3.2 thousand tests
Nov (Forecast)4.2 thousand tests3.2 thousand tests
Dec (Forecast)4.3 thousand tests3.2 thousand tests

Measurement history

Every reading with who entered it, its evidence and its approval. Formal measurement points are marked.

PeriodValueOf targetKindStateEntered byEvidence
October 20264.1⁦91%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-10-27K-3.3.1_2026-10_tracking.pdf
September 20264⁦89%⁩Formal measurementApprovedEng. Ibrahim A. Al-Ghamdi2026-10-05K-3.3.1_2026-09.pdf
August 20263.9⁦87%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-09-04K-3.3.1_2026-08_tracking.pdf
July 20263.8⁦84%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-08-07K-3.3.1_2026-07_tracking.pdf
June 20263.7⁦82%⁩Formal measurementApprovedEng. Ibrahim A. Al-Ghamdi2026-07-06K-3.3.1_2026-06.pdf
May 20263.6⁦80%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-06-05K-3.3.1_2026-05_tracking.pdf
April 20263.5⁦78%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-05-04K-3.3.1_2026-04_tracking.pdf
March 20263.4⁦76%⁩Formal measurementApprovedEng. Ibrahim A. Al-Ghamdi2026-04-07K-3.3.1_2026-03.pdf
February 20263.3⁦73%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-03-06K-3.3.1_2026-02_tracking.pdf
January 20263.3⁦73%⁩Tracking readingApprovedEng. Ibrahim A. Al-Ghamdi2026-02-05K-3.3.1_2026-01_tracking.pdf

Contributing projects

The projects that move this KPI, and each one’s share of the effect by budget size.

AI insight

Closing the gap runs through one project

The project with the most weight on this KPI is “Jeddah Branch & Qualification Centre”, with ⁦59%⁩ of the linked budget, and it is Off track. Speeding it up is the fastest way to close the gap before December.

Confidence⁦78%⁩

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • Equip 18 e-test rooms in the Al-Jouf centre within the current rehabilitation

    Eng. Mishari K. Al-OtaibiEng. Mishari K. Al-OtaibiDirector, Sustainability & Energy EfficiencyP-028m.alotaibi@sca.saDue ⁦2026-12-31⁩In 64 days2026-12-3122 Rajab 1448 AHAl-Jouf Training Centre Rehabilitation
    Open

Comments

The owner, the Performance Measurement Office and leadership discussing the readings.

No comments yet. Start the discussion on this KPI.

0 / 600

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close