Saudi Contractors Authority Strategy — Building the Future with Confidence

Training and test halls fitted out this year (cumulative)

At riskAwaiting approval

SCA services and programmes in every region·Specialised, Value-adding Services

Actual · October

97halls

2026 target

⁦120 halls⁩

Attainment

⁦81%⁩

Year-end forecast

⁦115 halls⁩

Forecast gap to target

⁦5 halls⁩

The path from baseline to 2030

Where the KPI stands today between its baseline, this year’s target and the 2030 target.

Baseline

⁦0 halls⁩

Today

⁦97 halls⁩

2026 target

⁦120 halls⁩

2030 target

⁦600 halls⁩

Left to the 2026 target
⁦23 halls⁩⁦81%⁩ of the way covered
Left to the 2030 target
⁦503 halls⁩⁦16%⁩ of the way covered

Monthly series and forecast

January – October measured, November and December forecast with a confidence band; the gold line is the 2026 target.

Monthly series and forecast
  • Actual
  • Baseline
  • Forecast
  • Forecast range
Monthly series and forecast
PeriodActualBaseline
Jan9 halls0 halls
Feb19 halls0 halls
Mar29 halls0 halls
Apr39 halls0 halls
May49 halls0 halls
Jun58 halls0 halls
Jul68 halls0 halls
Aug78 halls0 halls
Sep88 halls0 halls
Oct97 halls0 halls
Nov (Forecast)106 halls0 halls
Dec (Forecast)115 halls0 halls

Measurement history

Every reading with who entered it, its evidence and its approval. Formal measurement points are marked.

PeriodValueOf targetKindStateEntered byEvidence
October 202697⁦81%⁩Formal measurementAwaiting approvalEng. Fahad T. Al-Sulami2026-10-27K-3.1.2_2026-10.pdf
September 202688⁦73%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-10-05K-3.1.2_2026-09.pdf
August 202678⁦65%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-09-04K-3.1.2_2026-08.pdf
July 202668⁦57%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-08-07K-3.1.2_2026-07.pdf
June 202658⁦48%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-07-06K-3.1.2_2026-06.pdf
May 202649⁦41%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-06-05K-3.1.2_2026-05.pdf
April 202639⁦33%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-05-04K-3.1.2_2026-04.pdf
March 202629⁦24%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-04-07K-3.1.2_2026-03.pdf
February 202619⁦16%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-03-06K-3.1.2_2026-02.pdf
January 20269⁦8%⁩Formal measurementApprovedEng. Fahad T. Al-Sulami2026-02-05K-3.1.2_2026-01.pdf

Contributing projects

The projects that move this KPI, and each one’s share of the effect by budget size.

AI insight

Closing the gap runs through one project

The project with the most weight on this KPI is “SCA Headquarters, Riyadh”, with ⁦58%⁩ of the linked budget, and it is Off track. Speeding it up is the fastest way to close the gap before December.

Confidence⁦78%⁩

Corrective actions

What we are doing to bring the KPI back on track, who owns it, and by when.

  • An extra night shift on the Qassim vocational centre until year end

    Eng. Ibrahim A. Al-GhamdiEng. Ibrahim A. Al-GhamdiDirector, Engineering SupervisionP-036i.alghamdi@sca.saDue ⁦2026-12-31⁩In 64 days2026-12-3122 Rajab 1448 AHQassim Vocational Qualification Centre
    In progress

Comments

The owner, the Performance Measurement Office and leadership discussing the readings.

No comments yet. Start the discussion on this KPI.