The project with the most weight on this KPI is “Al-Khobar Branch — Rehabilitation & Extension”, with 66% of the linked budget, and it is Critical. Speeding it up is the fastest way to close the gap before December.
What we are doing to bring the KPI back on track, who owns it, and by when.
Fast-track grid connection of the solar plants on 12 SCA buildings and centres
Eng. Mishari K. Al-OtaibiEng. Mishari K. Al-OtaibiDirector, Sustainability & Energy EfficiencyP-028·m.alotaibi@sca.saDue 2026-12-15In 48 days2026-12-15·6 Rajab 1448 AHSolar Power for SCA Buildings & Centres