SCA/2024/009
Terms, guarantees, milestones, variation orders and payment certificates.
From original to current value
The original value and each approved variation
100% of the current value paid
Paid
6.9Mof a current value of SAR 6.9M
Build and launch the electronic model contracts platform: draft, sign and register model contracts online, with automatic alerts and a link to Muqawil.
Payments against accepted milestones per the payment schedule, within 30 days of the acceptance record.
Payment period
30 days
Retention
5%
Released at final acceptance
Advance payment
10%
Recovered from certificates
Penalty cap
6%
Of the contract value
Defects liability
6 months
After substantial completion
Bar: paid share of the value; gold mark: today
Met: 4 of 4
| Measure | Target | Achieved | Breach penalty |
|---|---|---|---|
| Production availability | 99.9% monthly | 99.96% | — |
| P1 incident response | within 30 min | average 12 min | — |
| P1 incident resolution | within 4 h | average 2.6 h | — |
| UAT defect fix | within 5 working days | average 3 days | — |
Integration-ready for EtimadIntegration-ready
Etimad reference: 2401640121
The integration layer is in place; data exchange starts once the permissions and interfaces are granted.
Bank guarantees and insurance policies with their expiry