Unified Operations Centre for Centres & Platforms
Add to watchlistA 24/7 operations centre watching the digital platforms, the test halls and the Authority’s buildings in every region.
Budget (BAC)
Actual cost
0% of budget
Progress
Estimate at completion
SPI · CPI
Forecast finish
On baseline
Pre-startStage 1 of 5
Next gate:Initiation4 November 2026
- Pre-start · Current stagePre-start · Current stage
- Gate into «Initiation»DecisionNot held yetDate4 November 2026Initiation · Not startedInitiation · Not started
- Gate into «Planning»DecisionNot held yetPlanning · Not startedPlanning · Not started
- Gate into «Execution»DecisionNot held yetExecution · Not startedExecution · Not started
- Gate into «Closure»DecisionNot held yetClosure · Not startedClosure · Not started
Scope statementRequired from Initiation
What the project delivers, what it does not, and when a deliverable counts as accepted.
A 24/7 operations centre watching the digital platforms, the test halls and the Authority’s buildings in every region.
In scope
- A 24/7 operations centre watching the digital platforms, the test halls and the Authority’s buildings in every region.
- Saudi Building Code compliance
- An approved plan to keep contractor services and training running during the works
Out of scope
- Operation and maintenance after the warranty period
- Work outside the approved site or system boundary
Acceptance criteria
- Main deliverable — stage 1Meets the approved specification, signed off by the project owner
- Main deliverable — final stageMeets the approved specification, signed off by the project owner
Scope baselineRequired from Planning
Every approved change creates a new baseline
No baseline yet — it is approved at the planning gate.
Requirements registerRequired from Planning
6 requirements of five kinds, with the trace status of each
By type
- Business1
- Functional1
- Technical1
- Regulatory2
- Security1
Fully traced
0%
0/6 · linked to a deliverable, task and test
Test passed
0%
0/6 · test result is a pass
Accepted
0%
0/6 · signed off by the business owner
Display options
| REQ-024-01 | Reach the target number of training & test halls | Business | Must | Draft | Eng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.sa | — | |
| REQ-024-02 | Meet the approved technical specs | Technical | Must | Draft | Eng. Omar H. BawazirEng. Omar H. BawazirDirector, IT InfrastructureP-024o.bawazir@sca.sa | — | |
| REQ-024-03 | Training and contractor service continue during the works | Functional | Must | Draft | Eng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.sa | — | |
| REQ-024-04 | Saudi Building Code | Regulatory | Should | Draft | Eng. Omar H. BawazirEng. Omar H. BawazirDirector, IT InfrastructureP-024o.bawazir@sca.sa | — | |
| REQ-024-05 | Civil-defence requirements | Regulatory | Should | Draft | Eng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.sa | — | |
| REQ-024-06 | Site and systems security | Security | Could | Draft | Eng. Omar H. BawazirEng. Omar H. BawazirDirector, IT InfrastructureP-024o.bawazir@sca.sa | — |
Traceability matrixRequired from Execution
Requirement → deliverable → task → test → acceptance. 6 requirements have a gap.