PRJ-2026-033On hold3PlanningConstruction

Wadi Al-Dawasir Vocational Qualification Centre

Add to watchlist

A permanent training and skills-test centre for the south of the Riyadh region, waiting for the land handover and title deed.

Budget (BAC)

SAR 210M

Actual cost

SAR 4.2M

⁦2%⁩ of budget

Progress

⁦2%⁩Awaiting acceptance ⁦0%⁩

Estimate at completion

SAR 210M

SPI · CPI

1.00Schedule performance index · 1.001.00Cost performance index · 1.00

Forecast finish

⁦2028-12-31⁩

184 days behind baseline

PlanningStage ⁦3⁩ of ⁦5⁩

Next gate:Execution15 July 2026

  1. Pre-start · CompletePre-start · Complete
  2. Gate into «Initiation»DecisionGoDate31 December 2025Initiation · CompleteInitiation · Complete
  3. Gate into «Planning»DecisionGoDate1 March 2026Planning · Current stagePlanning · Current stage
  4. Gate into «Execution»DecisionNot held yetDate15 July 2026Execution · Not startedExecution · Not started
  5. Gate into «Closure»DecisionNot held yetClosure · Not startedClosure · Not started

Milestones

Contractual, executive, payment, regulatory and project milestones: planned, forecast and actual dates, delay, owner, evidence and approval.

Milestone runway

0Achieved
0On track
4At risk
1Late
Average delay182 days
Oct 26Jan 27Apr 27Jul 27Oct 27Jan 28Apr 28Jul 28Oct 28Jan 29
Contractual
Build completePlanned: ⁦2027-07-28⁩Forecast / actual: ⁦2028-01-26⁩Delay: 182 daysG3 +182
Executive
Project plan approvedPlanned: ⁦2026-08-24⁩Forecast / actual: ⁦2027-02-15⁩Delay: 175 daysG1 +175
Payment
Final handoverPlanned: ⁦2028-06-30⁩Forecast / actual: ⁦2029-01-05⁩Delay: 189 daysG5 +189
Regulatory
Testing & acceptance completePlanned: ⁦2028-02-16⁩Forecast / actual: ⁦2028-08-20⁩Delay: 186 daysG4 +186
Project
Designs approvedPlanned: ⁦2027-01-06⁩Forecast / actual: ⁦2027-07-03⁩Delay: 178 daysG2 +178

The hollow diamond is the approved baseline date, the solid one the actual or forecast, the line between them the delay

Milestone register

⁦5⁩ results
Export CSV
Project plan approvedMS-G1Executive⁦2026-08-24⁩⁦2027-02-15⁩⁦+175⁩ daysEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saLate0Not requested
Designs approvedMS-G2Project⁦2027-01-06⁩⁦2027-07-03⁩⁦+178⁩ daysEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saAt risk0Not requested
Build completeMS-G3Contractual⁦2027-07-28⁩⁦2028-01-26⁩⁦+182⁩ daysEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saAt risk0Not requested
Testing & acceptance completeMS-G4Regulatory⁦2028-02-16⁩⁦2028-08-20⁩⁦+186⁩ daysEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saAt risk0Not requested
Final handoverMS-G5Payment⁦2028-06-30⁩⁦2029-01-05⁩⁦+189⁩ daysEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saAt risk0Not requested
⁦1⁩–⁦5⁩ of ⁦5⁩

Deliverables register

Each deliverable with its acceptance criteria, files, versions, reviewer and approver, through its states from draft to approved.

Progress counted from deliverables

Project progress = the sum of the weights of deliverables accepted with a completion certificate. Nothing counts before it is accepted and certified.

Weights sum to ⁦100%⁩

Counted

⁦2%⁩

Awaiting acceptance

⁦0%⁩

Not handed in

⁦98%⁩

Deliverable flow

Pick a stage to filter the register
⁦12⁩ results
Export CSV
Project plan & baseline033-D1⁦2%⁩CRT-033-01ApprovedEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saEng. Abdulrahman S. Al-Harbi⁦2026-06-17⁩V1⁦3⁩ of ⁦3⁩
Monitoring & reporting033-D2⁦3%⁩—DraftEng. Abdulrahman S. Al-HarbiEng. Abdulrahman S. Al-HarbiDean, SCA AcademyP-014ab.alharbi@sca.saEng. Abdulrahman S. Al-Harbi⁦2026-08-24⁩V0⁦0⁩ of ⁦3⁩
Detailed design033-D3⁦6%⁩—DraftEng. Abdulrahman S. Al-HarbiEng. Abdulrahman S. Al-HarbiDean, SCA AcademyP-014ab.alharbi@sca.saEng. Abdulrahman S. Al-Harbi⁦2026-10-30⁩V0⁦0⁩ of ⁦3⁩
Permits & approvals033-D4⁦6%⁩—DraftEng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-01-06⁩V0⁦0⁩ of ⁦3⁩
Site works & excavation033-D5⁦13%⁩—DraftEng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-03-15⁩V0⁦0⁩ of ⁦3⁩
Structure033-D6⁦13%⁩—DraftEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-05-21⁩V0⁦0⁩ of ⁦3⁩
Finishes033-D7⁦13%⁩—DraftEng. Abdulrahman S. Al-HarbiEng. Abdulrahman S. Al-HarbiDean, SCA AcademyP-014ab.alharbi@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-07-28⁩V0⁦0⁩ of ⁦3⁩
Supply033-D8⁦10%⁩—DraftEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-10-04⁩V0⁦0⁩ of ⁦3⁩
Installation033-D9⁦10%⁩—DraftEng. Abdulrahman S. Al-HarbiEng. Abdulrahman S. Al-HarbiDean, SCA AcademyP-014ab.alharbi@sca.saEng. Abdulrahman S. Al-Harbi⁦2027-12-10⁩V0⁦0⁩ of ⁦3⁩
Testing & commissioning033-D10⁦10%⁩—DraftEng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.saEng. Abdulrahman S. Al-Harbi⁦2028-02-16⁩V0⁦0⁩ of ⁦3⁩
Provisional acceptance033-D11⁦7%⁩—DraftEng. Abdulrahman S. Al-HarbiEng. Abdulrahman S. Al-HarbiDean, SCA AcademyP-014ab.alharbi@sca.saEng. Abdulrahman S. Al-Harbi⁦2028-04-23⁩V0⁦0⁩ of ⁦3⁩
Final acceptance033-D12⁦7%⁩—DraftEng. Turki A. Al-AnaziEng. Turki A. Al-AnaziHead, Qualification & Training SectorP-010t.alanazi@sca.saEng. Abdulrahman S. Al-Harbi⁦2028-06-30⁩V0⁦0⁩ of ⁦3⁩
Total · 12⁦100%⁩