AI insight
The Al-Khobar branch holds the worst quality problems
Two open NCRs (the underground-tank leak and the chiller-base concrete) costing SAR 2.4M, and the project audit found no resident quality engineer on site since June.
Quality plans, inspections, non-conformance reports and corrective actions.
Of 16 raised in 2026
64% with remarks · of 22 inspections
Of 4 open actions
From raising an NCR to closing it
Rework, retests and delay — 2026
Drag a report to its next stage. It cannot go to verification without a corrective action, nor close before its actions are done and verified.
Found, not yet investigated
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Root-cause analysis
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Corrective action under way
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Checking the fix works
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Closed after verification
Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.
Acceptance criteria met in each project’s plan, inspection pass rate and open NCRs — and the inspection & review calendar.
Worst first · click the criteria to open the quality plan
Scheduled for the next two weeks, and the latest results
Review of the handover file and documentation
Document review · Correspondence & Document Management System (DMS)
Design review of the redesigned foundation axes
Design review · Qassim Vocational Qualification Centre
Pre-launch penetration test
Security test · Muqawil Platform — Release 4
Re-test of tank 2 water-tightness
Site inspection · Al-Khobar Branch — Rehabilitation & Extension
MEP first fix — level 3
Site inspection · SCA Academy Campus, Riyadh
Basement retaining-wall inspection
Site inspection · Jeddah Branch & Qualification Centre
Backfill compaction — zone 3
Site inspection · SCA Headquarters, Riyadh
Waterproofing of the east roof
Site inspection · SCA Academy Campus, Riyadh
Flash test of panel batch 6
Material test · Solar Power for SCA Buildings & Centres
Acceptance test of the wave-one services
Acceptance test · Muqawil Platform — Release 4
Acceptance of fire alarm and suppression on floors 3 and 4
Site inspection · Khamis Mushait Training Centre Rehabilitation
AI insight
Two open NCRs (the underground-tank leak and the chiller-base concrete) costing SAR 2.4M, and the project audit found no resident quality engineer on site since June.
Every NCR, inspection, plan, standard and corrective action — searchable, filterable, exportable.
Display options
| Critical | Corrective action | Workmanship | Eng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa | 2026-09-18 | In 13 days2026-11-1030 Jumada I 1448 AH | SAR 1.8M | |
| High | Investigating | Materials | Eng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa | 2026-10-06 | In 8 days2026-11-0525 Jumada I 1448 AH | SAR 640K | |
| High | Verifying | Workmanship | Eng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.sa | 2026-08-27 | In 2 days2026-10-3019 Jumada I 1448 AH | SAR 920K | |
| High | Investigating | Design | Eng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction ProjectsP-020a.asiri@sca.sa | 2026-09-12 | In 5 days2026-11-0222 Jumada I 1448 AH | SAR 760K | |
| High | Verifying | Data | Dana S. Al-SalehDana S. Al-SalehDirector, Enterprise Systems & IntegrationP-025d.alsaleh@sca.sa | 2026-09-05 | 3 days overdue2026-10-2514 Jumada I 1448 AH | SAR 180K | |
| High | Open | Workmanship | Eng. Fahad T. Al-SulamiEng. Fahad T. Al-SulamiDirector, Regional Qualification CentresP-023f.alsulami@sca.sa | 2026-10-27 | In 27 days2026-11-2414 Jumada II 1448 AH | SAR 430K | |
| Medium | Open | Materials | Eng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.sa | 2026-10-22 | In 22 days2026-11-199 Jumada II 1448 AH | SAR 210K | |
| Medium | Open | Workmanship | Eng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction ProjectsP-020a.asiri@sca.sa | 2026-10-25 | In 18 days2026-11-155 Jumada II 1448 AH | SAR 280K | |
| Medium | Corrective action | Documentation | Eng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa | 2026-09-24 | 2 days overdue2026-10-2615 Jumada I 1448 AH | — | |
| Medium | Corrective action | Software | Eng. Sultan F. Al-GhamdiEng. Sultan F. Al-GhamdiProject Manager, Muqawil Platform — Release 4P-005s.alghamdi@sca.sa | 2026-10-01 | In 6 days2026-11-0323 Jumada I 1448 AH | SAR 95K | |
| Total · 12 | SAR 5.4M |
What changed in the quality records in this session.
No changes on this screen yet.