Quality

Quality plans, inspections, non-conformance reports and corrective actions.

Working on:Saudi Contractors Authority
Open NCRs
12⁦6⁩ critical or high

Of ⁦16⁩ raised in 2026

First-time pass
⁦36%⁩

⁦64%⁩ with remarks · of ⁦22⁩ inspections

Corrective actions overdue
1

Of ⁦4⁩ open actions

Average time to close
30 days

From raising an NCR to closing it

Cost of poor quality
SAR 7M

Rework, retests and delay — 2026

NCR lifecycle

Drag a report to its next stage. It cannot go to verification without a corrective action, nor close before its actions are done and verified.

Open3 · ⁦3⁩ cards

Found, not yet investigated

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Investigating4 · ⁦4⁩ cards

Root-cause analysis

⁦4⁩ of ⁦4⁩

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Corrective action3 · ⁦3⁩ cards

Corrective action under way

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Verifying2 · ⁦2⁩ cards

Checking the fix works

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Closed4 · ⁦4⁩ cards

Closed after verification

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Quality by project, and inspections

Acceptance criteria met in each project’s plan, inspection pass rate and open NCRs — and the inspection & review calendar.

Quality by project

Worst first · click the criteria to open the quality plan

ProjectCriteria metPass rateOpen NCRs

Inspections & reviews

Scheduled for the next two weeks, and the latest results

Upcoming
  • 302026-10

    Review of the handover file and documentation

    Document review · Correspondence & Document Management System (DMS)

  • 022026-11

    Design review of the redesigned foundation axes

    Design review · Qassim Vocational Qualification Centre

  • 042026-11

    Pre-launch penetration test

    Security test · Muqawil Platform — Release 4

  • 082026-11

    Re-test of tank 2 water-tightness

    Site inspection · Al-Khobar Branch — Rehabilitation & Extension

  • 112026-11

    MEP first fix — level 3

    Site inspection · SCA Academy Campus, Riyadh

Latest results
  • 262026-10

    Basement retaining-wall inspection

    Site inspection · Jeddah Branch & Qualification Centre

  • 242026-10

    Backfill compaction — zone 3

    Site inspection · SCA Headquarters, Riyadh

  • 212026-10

    Waterproofing of the east roof

    Site inspection · SCA Academy Campus, Riyadh

  • 192026-10

    Flash test of panel batch 6

    Material test · Solar Power for SCA Buildings & Centres

  • 192026-10

    Acceptance test of the wave-one services

    Acceptance test · Muqawil Platform — Release 4

    Passed
  • 152026-10

    Acceptance of fire alarm and suppression on floors 3 and 4

    Site inspection · Khamis Mushait Training Centre Rehabilitation

    Passed

Registers

Every NCR, inspection, plan, standard and corrective action — searchable, filterable, exportable.

Open
⁦12⁩ results
Export CSV
CriticalCorrective actionWorkmanshipEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa2026-09-18In 13 days2026-11-1030 Jumada I 1448 AHSAR 1.8M
HighInvestigatingMaterialsEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa2026-10-06In 8 days2026-11-0525 Jumada I 1448 AHSAR 640K
HighVerifyingWorkmanshipEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.sa2026-08-27In 2 days2026-10-3019 Jumada I 1448 AHSAR 920K
HighInvestigatingDesignEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction ProjectsP-020a.asiri@sca.sa2026-09-12In 5 days2026-11-0222 Jumada I 1448 AHSAR 760K
HighVerifyingDataDana S. Al-SalehDana S. Al-SalehDirector, Enterprise Systems & IntegrationP-025d.alsaleh@sca.sa2026-09-053 days overdue2026-10-2514 Jumada I 1448 AHSAR 180K
HighOpenWorkmanshipEng. Fahad T. Al-SulamiEng. Fahad T. Al-SulamiDirector, Regional Qualification CentresP-023f.alsulami@sca.sa2026-10-27In 27 days2026-11-2414 Jumada II 1448 AHSAR 430K
MediumOpenMaterialsEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Academy FacilitiesP-022s.almalki@sca.sa2026-10-22In 22 days2026-11-199 Jumada II 1448 AHSAR 210K
MediumOpenWorkmanshipEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector, Construction ProjectsP-020a.asiri@sca.sa2026-10-25In 18 days2026-11-155 Jumada II 1448 AHSAR 280K
MediumCorrective actionDocumentationEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa2026-09-242 days overdue2026-10-2615 Jumada I 1448 AH—
MediumCorrective actionSoftwareEng. Sultan F. Al-GhamdiEng. Sultan F. Al-GhamdiProject Manager, Muqawil Platform — Release 4P-005s.alghamdi@sca.sa2026-10-01In 6 days2026-11-0323 Jumada I 1448 AHSAR 95K
Total · 12SAR 5.4M
⁦1⁩–⁦10⁩ of ⁦12⁩

Activity

What changed in the quality records in this session.

Latest quality changes

No changes on this screen yet.

Chiller-base concrete below the specified strength

NCR-2026-044

HighMaterialsOpen for ⁦22⁩ days
2

Step ⁦2⁩ of ⁦5⁩

Investigating

What was found

28-day cubes gave C35 against the required C40 at four bases.

Immediate containment

Chiller installation halted on the four bases; cores being taken.

Root cause

Investigation under way.

Corrective actions (⁦0⁩)

No actions yet — add one before moving to verification.

Owner
Eng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Facilities Operations & MaintenanceP-021w.aljuhani@sca.sa
Raised by
Eng. Adel S. Al-AmoudiEng. Adel S. Al-AmoudiSenior Site Engineer (Contractor)P-043a.alamoudi@sca.sa
Raised on
2026-10-0625 Rabiʻ II 1448 AH
Due
In 8 days2026-11-0525 Jumada I 1448 AH
Vendor / contractor
United Buildings & Operations Co.
From inspection
INS-2026-066
Cost of poor quality
SAR 640K